Charging and Hydrogen Refuelling Infrastructure Initiative
The Charging and Hydrogen Refuelling Infrastructure Initiative (CHRI) aims to reduce transportation sector emissions by accelerating the private sector’s rollout of large-scale ZEV chargers and hydrogen refuelling stations, helping to spur the market for private investment.
We provide financing to the private sector to share in charging and refuelling infrastructure use risk by aligning repayment with use levels.
Offered by Canada Infrastructure Bank
Amount
Financing to the private sector with repayment aligned to use levels, under a minimum of $500 million dedicated by the CIB to the initiative
Quick eligibility check
Who can apply
To be considered, projects must:
- Involve public fast charging or hydrogen refuelling infrastructure located in Canada
- Be delivered by the private sector
- Be revenue generating and in the public interest
- Consist of large-scale deployment with total eligible project costs of at least $20 million
- Eligible project costs for investments should not exceed 50% to 80% of public funding, depending on the timing and location of the project
Financing is available based on a qualifying network implementation plan.
About the funding
Through this initiative, the CIB has dedicated a minimum of $500 million to support the federal government’s goals as part of Canada’s 2030 Emissions Reduction Plan.
We provide financing to the private sector to share in charging and refuelling infrastructure use risk by aligning repayment with use levels. If network use does not reach agreed levels, the required repayments will be proportionally lower. Conversely, in circumstances where use levels exceed expectations, the CIB’s return will increase proportionally. This financing structure addresses the uncertainty of ZEV adoption rates faced by developers and investors, so they can confidently invest in charging and refuelling infrastructure.
The CIB is also coordinating with Natural Resources Canada under their existing Zero-Emission Vehicle Infrastructure Program to maximize the effectiveness of the federal government’s contribution to charging infrastructure. Projects supported by the CIB will remain eligible for NRCan funding to the extent required for the project to remain commercially viable.
Similar programs
| Program | Type | Amount | Status |
|---|---|---|---|
| Apartment Construction Loan Program: Seniors Rental Housing | Loan | Up to 100% loan to cost for residential space and up to 75% loan to cost for non-residential space, with up to a 50-year amortization period | Open |
| Apartment Construction Loan Program: Standard Rental Housing | Loan | Low-cost loan of up to 100% loan to cost for residential space and up to 75% loan to cost for non-residential space, with up to a 50-year amortization period | Open |
| Apartment Construction Loan Program: Student Housing | Loan | Low-cost loan of up to 100% loan to cost for residential space and up to 75% loan to cost for non-residential space, with up to a 50-year amortization period and a fixed interest rate | Open |
| BDC Commercial real estate loan | Loan | Typically starts at $100,000 and can go up to several million dollars | Open |